Concept demo made by Nexibeo. This product does not exist yet. Co-create it with us
Change order documentationGet a free sample

For Construction project administrators

A traceable change narrative tied to instructions and supporting records.

For construction project administrators, turn approved site notes, photos and change instructions into reviewed change order record.

Start a pilotHow it works

The problem

Scope changes lack clear descriptions and evidence.

What you get

Reviewed change order record.

Approved site notes, photos and change instructions in, reviewed results out. People check what the AI drafts before anything reaches you.

Features

Everything the job needs, nothing it doesn't.

01Capture change facts
02Link site evidence
03Draft scope descriptions
04Record supplied cost impacts
05Preserve approval status
06Export review forms

How it works

From your files to approved results.

Source-based content workspace with editorial delivery.

  1. Collect a structured brief and source material
  2. Identify unanswered questions
  3. Approve an outline
  4. Generate a draft
  5. Verify claims
  6. Gather reviewer edits

Free sample

An evidence-backed sample change order.

Test USD 400-1,500 for a tightly scoped initial content package. Convert repeated work to a monthly retainer with explicit deliverable and revision limits. Specialist review and substantial research are separately scoped. Prices are hypotheses.

Start a pilot

This is a concept demo. The button goes to Nexibeo, where you can co-create this product.