Screenshot of the Construction access logistics planner interactive demo
Screenshot of the interactive demo, on sample data

Construction access logistics planner

Plan delivery access using explicit site constraints.

Try the interactive demo Get this built for you

For
Urban renovation project coordinators
Solves
Deliveries conflict with site access restrictions and other trades.
Delivers
Site-approved delivery access plan
Built in
about 5 weeks of creation time, MVP in 5 days
Investment
$15,500 for the MVP, $50,000 for the full product
Run it
Inside your business, or as part of your offer to clients
01

What it does

For urban renovation project coordinators, turn approved access plans and delivery requests into site-approved delivery access plan.

  1. Extract vehicle requirements.
  2. Apply supplied access windows.
  3. Flag overlapping deliveries.
  4. Suggest alternatives.
  5. Track site approval.
  6. Export logistics briefs.

What goes in, what comes out

What the customer puts in
  • Approved access plans
  • Delivery requests

AI drafts, people review. Assumption-driven planning and decision workspace.

What the customer gets
  • Site-approved delivery access plan
02

How it works

The workflow

  1. In
    Start with

    Approved access plans and delivery requests

  2. 1

    The buyer creates a project

  3. 2

    Supplies approved access plans and delivery requests

  4. 3

    Confirms scope and access

  5. Out
    Finish with

    Site-approved delivery access plan

AI does the heavy lifting, people stay in charge

Interpret requests while deterministic rules enforce supplied limits. Keep model suggestions separate from verified facts. Link factual outputs to authorized input evidence and show missing information explicitly. Use deterministic checks for counts, dates, identifiers and arithmetic where applicable. A designated reviewer validates consequential outputs and signs off the delivered result.

What your team sees

Key screens: Access calendar, Constraint map, Delivery review. Place editable drivers and constraints beside a clearly labeled scenario output. Include a baseline view, comparison chart or schedule, and an assumptions history. Let users trace a proposed quantity or date back to its inputs. Keep forecasts distinct from actual results. Open with access calendar; move into constraint map for the detailed task; finish in delivery review for review and handoff. Show the source record, uncertainty and approval status beside each proposed output.

Accounts and administration

Scenario versions, baseline reconciliation, constraint checks, assumption ownership, reviewer approvals, plan exports and actual-versus-plan tracking. Include organization-scoped access, named project owners, review queues, usage limits, export history and retention settings. Never reuse private customer material for other accounts without permission.

Integrations and data access

Property records, construction documents, project photos and supplier quotes. Read-only operational exports, calendars and finance or inventory records as relevant. Start with plan exports and retain human approval for execution. Begin with uploads and exports of approved access plans and delivery requests. Any named system or connector is a candidate requiring current access and compatibility checks; no live connection is included by default.

03

How we build it

We build with our own AI software development factory, so most implementations take days to a few weeks of creation time, not months. You see working software at every step, and exact timing depends on availability.

  1. 1

    Scoping call

    Day 1

    Thirty minutes on your process, your data and how you want to run it: for your own team, or for your clients. You get a fixed scope and price for the MVP.

  2. 2

    MVP

    5 days

    One buyer segment, one recurring use case; first modules: extract vehicle requirements; apply supplied access windows. Manual review in the loop. Built by our AI software factory.

  3. 3

    Paid pilot

    6 days

    Accounts, roles, review states, audit trail and the first integration, hardened for two to three paying pilot customers.

  4. 4

    Full product

    2 weeks

    Self-serve onboarding, billing, monitoring and the wider integration set.

  5. 5

    Run and improve

    Monthly

    We host, monitor and improve it for a fixed monthly fee, or hand it over to your team. How the retainer works.

Why we start with an MVP

An MVP, or minimum viable product, is the smallest version that your users can actually work with. It is not a cheap version of the full solution. It is a test, built to answer the questions that decide whether the rest is worth building.

  1. Pick the riskiest assumption. Here: will urban renovation project coordinators use it to solve "deliveries conflict with site access restrictions and other trades"?
  2. Build only what tests it. One team, one use case, a few core modules. People do the rest by hand for now.
  3. Run a paid pilot. Agree the acceptance criteria, input limits and reviewer responsibilities before starting.
  4. Measure, then decide. Track access conflicts and rejected delivery slots. Then expand, change course or stop, with evidence instead of opinions.

MVP scope for this solution. Costed pilot: Planning support; traffic permits and safety assessments excluded. Start with one buyer organization and a bounded set of representative inputs. Implement the first two modules: extract vehicle requirements; apply supplied access windows. Support the third task through an assisted review queue: flag overlapping deliveries. Handle the remaining required functions manually until validated. Include input upload, source references, user correction, a reviewer approval step and export of site-approved delivery access plan. Authentication, account isolation, deletion controls and basic operational logging are included. Specialized production certification, live write integrations and broader rollout are not included unless explicitly stated.

After the MVP. After paying customers repeatedly accept site-approved delivery access plan, automate suggest alternatives; track site approval; export logistics briefs. Add one tested read integration, reusable customer configuration and scheduled repeat delivery. Increase supported formats or teams only when evaluation cases and reviewer capacity cover the new scope. Planning support; traffic permits and safety assessments excluded.

What the build depends on. A defensible calculation model, explicit units, constraint validation and representative boundary tests. Advanced forecasting or optimization needs adequate historical data. Obtain representative authorized inputs, an agreed review rubric and a buyer-side owner. Specific scope: Planning support; traffic permits and safety assessments excluded.

04

Investment

A planning range to start the conversation, not a quote. You pay per phase, so you can stop after the MVP.

  1. Phase 1

    MVP

    One buyer segment, one recurring use case; first modules: extract vehicle requirements; apply supplied access windows. Manual review in the loop.

    $15,500 · about 5 days of creation time

  2. Phase 2

    Paid pilot

    Accounts, roles, review states, audit trail and the first integration, hardened for two to three paying pilot customers.

    $14,500 · about 6 days of creation time

  3. Phase 3

    Full product

    Self-serve onboarding, billing, monitoring and the wider integration set.

    $20,000 · about 2 weeks of creation time

Indicative total, MVP to full product$50,000about 5 weeks of creation time · start with the MVP from $15,500

Running costs per month

A rough indication of monthly hosting and AI model costs once it is live, not tested. Real costs depend on usage, file sizes and the models chosen.

StageHosting and infrastructureAI usageTotal per month
MVP and paid pilotabout 3 customers$30–$60$50–$100$80–$160
Full productabout 50 customers$110–$210$350–$700$460–$910
05

Run it or resell it

Internally

For your own team

Urban renovation project coordinators run it inside the business: approved access plans and delivery requests in, site-approved delivery access plan out, reviewed by your people.

For your clients

As part of your offer

Agencies, consultancies and software companies can offer it to their own clients under their brand. We build and maintain it; you sell and deliver it.

Your brand, or this one

Run it under your own brand, or start from this concept style.

  • primary#91278d
  • accent#54c966
  • surface#f1e4f0
  • ink#22201e
Headings
DM Serif Display
Text
DM Sans
Voice
Solid, practical, on-schedule
Selling it to your own clients: the go-to-market playbook

Pricing to test

Test USD 750-3,000 for a scoped planning setup and review, then USD 200-900 monthly for refreshes within agreed complexity. Data integration and optimization are separately scoped. All ranges are hypotheses. For this buyer, package the first sale around plan one week's deliveries and the defined site-approved delivery access plan. Record actual review effort before offering a recurring allowance. The commercial pilot fee is distinct from the platform development budget.

Message to test

Plan delivery access using explicit site constraints. Demonstrate the result with plan one week's deliveries for urban renovation project coordinators. Use a concrete before-and-after example without promising unmeasured savings.

Where to find buyers

Renovation contractors and logistics coordinators

Lead magnet

Plan one week's deliveries

The first 30 days

  1. Week 1: interview five prospective buyers from urban renovation project coordinators and inspect how they handle deliveries conflict with site access restrictions and other trades.
  2. Week 2: prepare plan one week's deliveries using authorized or synthetic material.
  3. Week 3: share the demonstration through renovation contractors and logistics coordinators and seek one bounded paid pilot.
  4. Week 4: measure access conflicts and rejected delivery slots, review delivery effort and ask for a repeat purchase. This is a validation schedule, not a promise that the full product can be built in thirty days.

Paid pilot

Agree the acceptance criteria, input limits and reviewer responsibilities before starting. Run plan one week's deliveries and deliver site-approved delivery access plan. Compare access conflicts and rejected delivery slots with the buyer's current process on comparable cases; include corrections, missed issues and reviewer time. Seek payment and repeat use. Stop or revise the scope if data access, accuracy or unit economics fail.

Success metrics

Access conflicts and rejected delivery slots

Retention and expansion

Build repeat use around site-approved delivery access plan. Save approved configurations and review decisions with permission, revisit unresolved exceptions and show progress on access conflicts and rejected delivery slots. Offer a recurring volume allowance after repeat demand; expand to adjacent tasks only when the buyer asks and delivery quality remains acceptable.

Why clients would pick it

A validated domain model, customer-approved constraints and forecast or decision history that improves practical planning. For this concept, accumulate permissioned examples and reviewer corrections around plan delivery access using explicit site constraints. The durable asset is reliable task-specific execution and trusted customer configuration, not access to a general-purpose AI model.

Alternatives and positioning

Spreadsheets, planners, specialist forecasting tools and existing scheduling or configuration software. Position this concept around plan delivery access using explicit site constraints. Compare it against the customer's current process on the same representative task. This is proposed differentiation; no exhaustive competitor study or uniqueness claim has been established.

Main delivery costs

Data preparation, domain modeling, validation, scenario computation, reviewer support and ongoing assumption maintenance. Initial validation additionally budgets for site manager review. Track model usage, storage, reviewer minutes, exception handling and customer support per accepted deliverable.

06

Safeguards

Verify property facts and scope assumptions. Clearly label visual alterations. Professional reviewers retain responsibility for contracts, engineering and legal interpretations. Planning support; traffic permits and safety assessments excluded. Require appropriate access and publication approval. Preserve source material, label AI drafts and make corrections traceable. Measure false positives and missed cases alongside speed.

Get this solution built

Built for you by our AI software factory, MVP in about 5 days. Tell us about your business and how you want to run it: inside your company, or as part of what you offer your clients. We reply within one working day.

More in Real Estate and Construction

Bring one process you are sick of. In thirty minutes we will tell you whether it can run itself. Book a call.

© 2026 Nexibeo LimitedFounded 2017contact@nexibeo.com